{"currentVersion":"v5.68.0","changelog":[{"version":"v5.68.0","releasedAt":"2026-08-22","summary":"Review warnings now fire on the jobs that need them, not on every job."},{"version":"v5.67.0","releasedAt":"2026-08-20","summary":"Margin settings for firms that price differently when they are busy."},{"version":"v5.66.0","releasedAt":"2026-08-19","summary":"Storage pricing, including storage with no fixed end date."},{"version":"v5.65.0","releasedAt":"2026-08-15","summary":"Crew size is now a choice on the plan, and the price reflects it."},{"version":"v5.64.0","releasedAt":"2026-08-12","summary":"Unpacking at the destination"},{"version":"v5.63.0","releasedAt":"2026-08-12","summary":"Pricing-method safety checks"},{"version":"v5.62.0","releasedAt":"2026-08-10","summary":"Firm-supplied cost figures"},{"version":"v5.61.0","releasedAt":"2026-08-10","summary":"Margin and minimum-charge separation"},{"version":"v5.60.0","releasedAt":"2026-08-10","summary":"Depot journey charging"},{"version":"v5.59.0","releasedAt":"2026-08-09","summary":"Minimum charge accuracy"},{"version":"v5.58.0","releasedAt":"2026-08-09","summary":"Crew cost accuracy"},{"version":"v5.57.0","releasedAt":"2026-08-06","summary":"Job risk assessment"},{"version":"v5.56.0","releasedAt":"2026-08-06","summary":"Minimum charge"},{"version":"v5.55.0","releasedAt":"2026-08-06","summary":"Crew-size threshold pricing"},{"version":"v5.54.0","releasedAt":"2026-08-05","summary":"Crew-size pricing transitions"},{"version":"v5.53.0","releasedAt":"2026-08-05","summary":"Multi-day job planning"},{"version":"v5.52.0","releasedAt":"2026-08-04","summary":"Storage on a quote"},{"version":"v5.51.0","releasedAt":"2026-08-04","summary":"Lift handling on multi-floor jobs"},{"version":"v5.50.0","releasedAt":"2026-08-04","summary":"Margin settings for cost-plus pricing"},{"version":"v5.49.0","releasedAt":"2026-08-04","summary":"Vehicle running costs"},{"version":"v5.48.0","releasedAt":"2026-08-03","summary":"Crew-size recommendations on constrained properties"},{"version":"v5.47.0","releasedAt":"2026-07-31","summary":"Below-cost warnings on cost-plus quotes"},{"version":"v5.46.0","releasedAt":"2026-07-29","summary":"Multi-day job planning follows the rules of the region it is in"},{"version":"v5.45.0","releasedAt":"2026-07-28","summary":"More accurate time and cost for jobs with a lift"},{"version":"v5.44.0","releasedAt":"2026-07-27","summary":"Choosing how a job is spread across days"},{"version":"v5.43.0","releasedAt":"2026-07-25","summary":"Clearer quote wording and a steadier confidence rating"},{"version":"v5.42.0","releasedAt":"2026-07-22","summary":"Vehicle access limits"},{"version":"v5.41.0","releasedAt":"2026-07-17","summary":"Multi-trip route mileage"},{"version":"v5.40.0","releasedAt":"2026-07-17","summary":"Vehicle-plan selection"},{"version":"v5.39.0","releasedAt":"2026-07-15","summary":"Duty-limit warnings and pre-pack reporting"},{"version":"v5.38.0","releasedAt":"2026-07-14","summary":"Alternative day-plan options on the quote"},{"version":"v5.37.0","releasedAt":"2026-07-14","summary":"Overnight costs on long-distance moves"},{"version":"v5.36.0","releasedAt":"2026-07-14","summary":"Mileage accuracy on multi-load jobs"},{"version":"v5.35.0","releasedAt":"2026-07-14","summary":"Ireland: region-specific statutory and tax rules"},{"version":"v5.34.0","releasedAt":"2026-07-14","summary":"Per-vehicle running costs"},{"version":"v5.33.0","releasedAt":"2026-07-14","summary":"Crew option ranking"},{"version":"v5.32.0","releasedAt":"2026-07-14","summary":"Crew suggestion search"},{"version":"v5.31.0","releasedAt":"2026-07-14","summary":"Crew size and job duration"},{"version":"v5.30.0","releasedAt":"2026-07-14","summary":"Multi-vehicle planning"},{"version":"v5.29.0","releasedAt":"2026-07-14","summary":"Crew and vehicle plans matched to the firm"},{"version":"v5.28.0","releasedAt":"2026-07-14","summary":"Overnight subsistence on multi-day jobs"},{"version":"v5.27.0","releasedAt":"2026-07-14","summary":"Long-distance driving limits and travel time"},{"version":"v5.26.0","releasedAt":"2026-07-14","summary":"Pre-load day planning and nights away"},{"version":"v5.25.0","releasedAt":"2026-07-14","summary":"Long day and split day priced separately"},{"version":"v5.24.0","releasedAt":"2026-07-14","summary":"Pre-load dispatch thresholds"},{"version":"v5.23.0","releasedAt":"2026-07-14","summary":"Multi-day job costs"},{"version":"v5.22.0","releasedAt":"2026-07-14","summary":"Depot journey in the cost model"},{"version":"v5.21.0","releasedAt":"2026-07-14","summary":"Day-split recommendations"},{"version":"v5.20.0","releasedAt":"2026-07-14","summary":"Destination access work scheduling"},{"version":"v5.19.0","releasedAt":"2026-07-14","summary":"Nights-away reporting and overtime labelling"},{"version":"v5.18.0","releasedAt":"2026-07-14","summary":"Vehicle-dependent duty limits and statutory rest"},{"version":"v5.17.0","releasedAt":"2026-07-14","summary":"Dispatch planning within the lawful day"},{"version":"v5.16.0","releasedAt":"2026-07-14","summary":"Groundwork: handling environment and mechanical aid"},{"version":"v5.15.0","releasedAt":"2026-07-13","summary":"Unloading and a below-cost guardrail"},{"version":"v5.14.0","releasedAt":"2026-07-13","summary":"Fragility risk assessment"},{"version":"v5.13.0","releasedAt":"2026-07-13","summary":"Per-address access capture"},{"version":"v5.12.0","releasedAt":"2026-07-13","summary":"Mileage charging"},{"version":"v5.11.0","releasedAt":"2026-07-07","summary":"Graded confidence band"},{"version":"v5.10.0","releasedAt":"2026-07-07","summary":"Quote composition and cost visibility"},{"version":"v5.9.0","releasedAt":"2026-07-06","summary":"Vehicle fleet and selection"},{"version":"v5.8.0","releasedAt":"2026-07-06","summary":"Cost and charge reporting"},{"version":"v5.7.0","releasedAt":"2026-07-06","summary":"Item handling properties"},{"version":"v5.6.0","releasedAt":"2026-07-06","summary":"Access taxonomy: lift status"},{"version":"v5.5.0","releasedAt":"2026-07-06","summary":"Full vehicle route"},{"version":"v5.4.0","releasedAt":"2026-07-06","summary":"Region-neutral distance handling"},{"version":"v5.3.0","releasedAt":"2026-06-26","summary":"Time budget and access geometry"},{"version":"v5.2.0","releasedAt":"2026-05-15","summary":"Risk profile and confidence scoring"},{"version":"v5.1.0","releasedAt":"2026-04-01","summary":"Deterministic replay and versioned config"},{"version":"v5.0.0","releasedAt":"2026-02-20","summary":"Multi-region and internationalisation"}],"latestEntry":{"version":"v5.68.0","releasedAt":"2026-08-22","summary":"Review warnings now fire on the jobs that need them, not on every job."}}